The Coimbatore Bypass Road Project
<<Previous
REVENUE GENERATION contd...L&T gave special
emphasis to safety aspect of the road. Crash barriers were provided on the
high embankment of the road, along with thermo plastic road markings.
Traffic signals were erected at the junctions of Neelambur (Tamilnadu),
Madukkarai (Kerala), Trichy Road (Tamilnadu), and Pollachi Road (Kerala).
Speed breakers were erected at suitable locations on the major district
roads crossing the bypass to regulate the speed of vehicles. Retro
reflective signboards were also provided to illuminate junctions for better
visibility at nights. L&T also set up trauma care with ambulance facility at
the bypass.
TABLE I
TOLL CHARGES FOR USING THE COIMBATORE BYPASS ROAD
Type of Vehicle |
Toll Charged (Rs.) |
Car, jeep & van |
19 |
Light Commercial Vehicles |
28 |
Heavy commercial vehicles |
56 |
Multi-axle vehicles |
84 |
Source:ICMR.
The Indian Railways asked L&T to build a rail overbridge
instead of a crossing for the bypass[8] . However, L&T successfully argued that
it was not part of the original project. In order to recover the additional
costs, an alternative funding method had to be selected to keep the fixed
costs to be recovered from the project at low. Hence, with the consent of
the state government, L&T decided to toll the old Athupalam Bridge, which
did not come within the route of the bypass
(Refer Table II).
TABLE II
TOLL CHARGES FOR USING THE OLD ATHUPALAM BRIDGE
Type of Vehicle |
Toll Charged (Rs.) |
Car, jeep & van |
5 |
Light Commercial Vehicles |
15 |
Heavy commercial vehicles |
15 |
Multi-axle vehicles |
2 |
Source:ICMR.
L&T also intended to provide necessary amenities for travelers such as
petrol pumps, parking facilities, service stations, restaurants, drinking
water facility, public telephone booths etc. The development of the real
estate was to be taken up soon. Toll plazas of international standards were
another attraction.
QUESTIONS FOR DISCUSSION
ADDITIONAL READINGS AND REFERENCES
[8] As a policy decision, Indian
Railways had upgraded the construction of railway crossings to rail
overbridge.
2010, ICMR (IBS Center for Management Research).All rights reserved. No part of this publication may be
reproduced, stored in a retrieval system, used in a spreadsheet, or transmitted
in any form or by any means - electronic or mechanical, without permission.
To order copies, call +91- 8417- 236667 or write to ICMR,
Survey No. 156/157, Dontanapalli Village, Shankerpalli Mandal,
Ranga Reddy District,
Hyderabad-501504.
Andhra Pradesh, INDIA.
Ph: +91- 8417- 236667,
Fax: +91- 8417- 236668
E-mail: info@icmrindia.org