 Abstract:
					
						| 
This case is about German automobile manufacturer, the BMW Group's "MINI 
Production Triangle", a production network of its premium small car brand MINI. 
The BMW Group started production of the MINI at its Oxford plant in the UK in 
April 2001. In 2006, in order to further increase the existing production 
capacity of the MINI, the management of the BMW Group integrated its three 
manufacturing units in the UK and started a production triangle called the "MINI 
Production Triangle" (MPT). The three plants which geographically looked like 
three points of a triangle were the Oxford plant, the Swindon plant, and the 
Hams Hall plant. |   
 |  Plant Oxford was responsible for the 
				bodyshell production, paintshop, and final assembly of the MINI. 
				The Hams Hall plant supplied petrol engines while the Swindon 
				plant supplied pressings and sub-assemblies to Plant Oxford.
 The case discusses the objectives of the MINI Production 
				Triangle and briefly describes the MINI production process. The 
				production of the MINI involved three steps - Bodyshell 
				Production, Paintshop, and Assembly. Bodyshell production was 
				carried out at Plant Oxford and included manufacturing the body 
				of the MINI. The second step in the MPT was the paintshop where 
				the bodyshell was painted with several coats of color. During 
				the assembly process, the 2,415 different inner and outer parts 
				of the MINI were mounted on to the painted bodyshell. The 
				engines were delivered from Hams Hall just-in-sequence to the 
				assembly line in Oxford as per the production requirements. The 
				pressings and body components were delivered just-in-time from 
				Swindon directly to the body production facility at the Oxford 
				plant. The entire production process, right from the delivery of 
				the engine components to the complete assembly of the 
				components, took around seven days.
 
 The case also talks about other aspects related to the MINI 
				Production Triangle such as logistics, training and development 
				of associates, efficient resource management, and community 
				involvement in the MINI Production Triangle. It concludes with a 
				description of the results achieved in terms of sales and 
				production volumes of MINI after the implementation of the MINI 
				Production Triangle.
 Issues:
» Study the MINI production strategy adopted by the BMW Group, with special 
emphasis on the MINI Production Triangle set up in 2006.
 » Understand the issues and challenges associated with the MINI production 
process.
 
 » Examine the role of the three production plants in the MINI Production 
Triangle.
 
 » Understand concepts such as Just-in-time and Just-in-sequence, and their 
importance.
 
 » Analyze the significance of integrating manufacturing plants in automobile 
production to improve productivity and enable customization.
 
 Contents:Keywords:MINI Production Triangle, Lean manufacturing, Flexible manufacturing system, logistics, Just In Time, Just In Sequence, Customer Oriented Sales and Production Process, KOVP, Plant Swindon, Assembly, Bodyshell production, Paintshop, Plant Hams Hall, Pressings, Sub-assemblies, Production management, MINI, UK-based supply industry, UK Automotive Industry, Plant Oxford, Plant Swindon, Plant Hams Hall 
BMW Group's MINI Production Triangle
- Next Page>> 
 
  
 |  |